Browse
← Older: Beard Eaves Memorial Coliseum
Patrick Nelson with Davis Architects
BEARD EAVES MEMORIAL COLISEUM
Auburn, Alabama
Completed 2006
The scope of the project was to replace a removable athletic floor with a high …
Newer: Pass Christian Mixed Use →
Regarding Architecture
PASS CHRISTIAN MIXED USE
Pass Christian, Mississippi
Conceptual Renderings
This proposed mixed use development was the first of its kind to be introduced to this hurricane ravaged …
Auburn Arena
Patrick Nelson with Davis Architects
AUBURN ARENA
Auburn, Alabama
Completed 2010
The new Auburn Arena provided a much needed, updated facility for men’s and women’s basketball, women’s gymnastics and the Lovelace Athletic Museum. Incorporated into the arena are two full size practice courts adjoined by a new weight room. Administrative areas overlook the practice courts. Tailgating suites may be used for both basketball and football games. The suites open up facing Jordan Hare Stadium and provide a small outdoor patio and grill space. While the new arena is smaller than its predecessor, all patrons are provided an incredible view of the court, regardless of their seat location.